 <?xml-stylesheet type="text/css" href="https://hosting.esdm.co.uk/Data/style/rss/rss1.css" ?> <?xml-stylesheet type="text/xsl" href="https://hosting.esdm.co.uk/Data/style/rss/rss1.xsl" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd">
  <channel>
    <title>Service Status Blog</title>
    <link>https://hosting.esdm.co.uk/service-status</link>
    <description />
    <docs>http://www.rssboard.org/rss-specification</docs>
    <generator>mojoPortal Blog Module</generator>
    <language>en-GB</language>
    <ttl>5</ttl>
    <atom:link href="https://hosting.esdm.co.uk/Blog/RSS.aspx?p=1018~1446~20&amp;r=4250c3a8-b8e1-4f58-8d7f-4f1c4b26b9b9" rel="self" type="application/rss+xml" />
    <itunes:owner />
    <itunes:explicit>no</itunes:explicit>
    <item>
      <title>Planned server move completed successfully - November 22nd 2015</title>
      <description><![CDATA[<p>The move went smoothly and the servers are now installed in the new data centre and&nbsp;everything is up and running from the tests we have run. &nbsp;We do not anticipate the move creating issues for any systems as all IP addresses etc have remained unchanged.</p>
<br /><a href='https://hosting.esdm.co.uk/planned-server-move-completed-successfully-november-22nd-2015'>JamesP@esdm.co.uk</a>]]></description>
      <link>https://hosting.esdm.co.uk/planned-server-move-completed-successfully-november-22nd-2015</link>
      <author>JamesP@esdm.co.uk (JamesP@esdm.co.uk)</author>
      <comments>https://hosting.esdm.co.uk/planned-server-move-completed-successfully-november-22nd-2015</comments>
      <guid isPermaLink="true">https://hosting.esdm.co.uk/planned-server-move-completed-successfully-november-22nd-2015</guid>
      <pubDate>Sun, 22 Nov 2015 12:53:00 GMT</pubDate>
    </item>
    <item>
      <title>Planned downtime for server moves 21st November 2015</title>
      <description><![CDATA[<p>We are moving all of our servers from the Telehouse datacentre to another datacentre in North London. This move will provide us with better support from our suppliers and enable faster responses to any issues in future. Details of the new datacentre:</p>

<p>LOCATION: <a href="http://virtusdatacentres.com/locations/enfield-lon-1/" target="_blank">http://virtusdatacentres.com/locations/enfield-lon-1/</a><br />
CERTIFICATIONS: <a href="http://virtusdatacentres.com/why-virtus/quality-credentials/" target="_blank">http://virtusdatacentres.com/why-virtus/quality-credentials/</a><br />
WHY VIRTUS: <a href="http://virtusdatacentres.com/why-virtus/" target="_blank">http://virtusdatacentres.com/why-virtus/</a></p>

<p>In order to facilitate this move we will be shutting down&nbsp;all of our&nbsp;hosting servers at 8pm on Saturday 21st Nov 2015. We aim to bring them all back online from about 1am, when&nbsp;we will carry out testing to ensure things are up and running correctly.</p>
<br /><a href='https://hosting.esdm.co.uk/planned-downtime-for-server-moves-21st-november-2015'>Crispin Flower</a>]]></description>
      <link>https://hosting.esdm.co.uk/planned-downtime-for-server-moves-21st-november-2015</link>
      <author>crispin.flower@idoxgroup.com (Crispin Flower)</author>
      <comments>https://hosting.esdm.co.uk/planned-downtime-for-server-moves-21st-november-2015</comments>
      <guid isPermaLink="true">https://hosting.esdm.co.uk/planned-downtime-for-server-moves-21st-november-2015</guid>
      <pubDate>Tue, 17 Nov 2015 15:50:00 GMT</pubDate>
    </item>
    <item>
      <title>Planned downtime for firewall work, 29th October 2015</title>
      <description><![CDATA[<p>We will take our firewall offline intermittently from&nbsp;around 23:30 for essential maintenance following today's outages. Services should be normal after about 2 hours.</p>
<br /><a href='https://hosting.esdm.co.uk/planned-downtime-for-firewall-work-29th-october-2015'>Crispin Flower</a>]]></description>
      <link>https://hosting.esdm.co.uk/planned-downtime-for-firewall-work-29th-october-2015</link>
      <author>crispin.flower@idoxgroup.com (Crispin Flower)</author>
      <comments>https://hosting.esdm.co.uk/planned-downtime-for-firewall-work-29th-october-2015</comments>
      <guid isPermaLink="true">https://hosting.esdm.co.uk/planned-downtime-for-firewall-work-29th-october-2015</guid>
      <pubDate>Thu, 29 Oct 2015 22:55:00 GMT</pubDate>
    </item>
  </channel>
</rss>